Today
Secret
Unspecified
Unspecified
Construction/Facilities
Washington Navy Yard, DC (On-Site/Office)
Duties
Requirements
Conditions of Employment
GS-13
Your resume must demonstrate at least one year of specialized experience at or equivalent to the GS-12 grade level or pay band in the Federal service or equivalent experience in the private or public sector: 1) Providing scheduling training to field offices and respective personnel covering basic understanding of network analysis schedules, critical path method, time impact analysis, baseline and progress schedule reviews; 2) Providing assistance in validating impacts to the approved construction schedule and reviewing time impact analysis proposal regarding affected activities on the critical path and assisting in developing the Government's position regarding delays and/or liability; 3) Utilizing scheduling programs (P6, MS Project), forecasting, techniques, and critical path methodology to gather and evaluate contractor schedule and technical performance; and 4) Analyzing and mitigating techniques for schedule variance, schedule adherence, system engineering, integrated logistics, quality assurance, production and contractual management of construction projects. NOTE: This information must be supported in your resume.
GS-12
Your resume must demonstrate at least one year of specialized experience at or equivalent to the GS-12 grade level or pay band in the Federal service or equivalent experience in the private or public sector: 1) Providing assistance and technical guidance to engineers/architects during the design phase of construction projects to ensure an appropriate construction duration is established for all construction projects; 2) Developing technical recommendations/solutions regarding construction scheduling issues and time impacts/complex problems during the administration and construction contracts; 3) Participating extensively in the pre-construction and post-construction award support aspects of scheduling requirements and performing Time Impact Analysis (TIA) on projects to ensure programs stay on track; and 4) Maintaining historical and current metrics on schedule growth differentiating types of delays impacting project progress (i.e. slow progress, rework, late procurement, internal delays). NOTE: Incumbent performs all or essentially all duties of the target position under general supervision and this information must be supported in your resume.
Additional qualification information can be found from the following Office of Personnel Management web site: http://www.opm.gov/qualifications/Standards/group-stds/gs-admin.asp .
Experience refers to paid and unpaid experience, including volunteer work done through National Service programs (e.g., professional, philanthropic, religious, spiritual, community, student, social). Volunteer work helps build critical competencies, knowledge, and skills and can provide valuable training and experience that translates directly to paid employment.
Education
This job does not have an education qualification requirement.
Additional information
This position is covered by the Department of Defense Priority Placement Program.
Additional vacancies may be filled by this announcement.
Recruitment incentives may be authorized to eligible new hires.
A relocation incentive is generally a single payment intended to offset some of the relocation costs experienced by the selectee. A relocation incentive may be authorized.
PCS is not authorized.
This position is eligible for part time, full time or ad-hoc telework at the discretion of management.
A tentative offer of employment will be rescinded if the selectee fails to meet the pre-employment requirements, including failure to report to any of the scheduled appointments.
If you are unable to apply online and request information about the Alternate Application process, please contact the Department of Navy's Employment Information Center.
Federal annuitant information: The selection of an annuitant is subject to the Department of Defense and Department of the Navy policy on the employment of annuitants. Policy information may be found at: http://www.secnav.navy.mil/donhr/Documents/CivilianJobs/FedCivAnnuitants.pdf
ICTAP Applicants: To be considered well-qualified and exercise selection priority as an ICTAP candidate, displaced Federal employees must satisfy all qualification requirements for the position and receive a rating in the highly qualified category (score 85) or higher. ICTAP candidates must provide copies of all of the following documentation at the time of application: 1) agency notice; 2) most recent performance appraisal; and 3) most recent SF-50 or notification of personnel action that includes position, grade level, and duty location. Applicants who do not provide this documentation will not receive consideration as an ICTAP candidate. For more information about ICTAP eligibility please review the following link: https://www.usajobs.gov/Help/working-in-government/unique-hiring-paths/federal-employees/career-transition/
Military Spouse Preference applicants will be placed at the highest grade for which they have applied and are determined Best Qualified (BQ). A BQ military spouse possesses knowledge, skills, abilities, and competencies comparable to others who meet the competitive referral criteria for the specific position.
PPP applicants will be placed at the FPL, if determined Well Qualified (WQ). To receive priority consideration, the FPL must be the same grade level or equivalent of the retained grade or the grade held immediately prior to separation.
How You Will Be Evaluated
You will be evaluated for this job based on how well you meet the qualifications above.
In order to qualify for this position, your resume must provide sufficient experience and/or education, knowledge, skills, and abilities to perform the duties of the specific position for which you are being considered. Your resume is the key means we have for evaluating your skills, knowledge, and abilities as they relate to this position. Therefore, we encourage you to be clear and specific when describing your experience.
When the application process is complete, we will review your resume to ensure you meet the hiring eligibility and qualification requirements listed in this announcement. You will be rated based on the information provided in your resume and responses to the Occupational Questionnaire, along with your supporting documentation to determine your ability to demonstrate the following competencies:
If after reviewing your resume and supporting documentation, a determination is made that you inflated your qualifications and/or experience, your score may be adjusted to more accurately reflect your abilities or you may be found ineligible/not qualified.
Please follow all instructions carefully. Errors or omissions may affect your rating or consideration for employment.
All eligibility, qualifications, and time-in-grade requirements must be met by the closing date of this announcement.
Required Documents
You are required to provide documentation that supports the eligibility and qualification claims made in your resume and assessment questionnaire. You must submit the applicable documents listed here and those listed with the eligibilities you select in the announcement questionnaire with your application package. Applicants who do not provide supporting documentation that fully support their claims will not be referred to the hiring manager. Cover letter is optional.
A complete resume is required. Your resume must show relevant experience, job title, duties and accomplishments. Your resume must show complete information for each job entry to support minimum qualifications. The following information should be provided in your resume, but it is acceptable to provide elsewhere in your application package: employer's name, starting and end dates (Mo/Yr), hours per week, and pay plan, series and grade level (e.g. GS-0201-09) for relevant federal experience. TIP: A good way to ensure you include all essential information is to use the Resume Builder in USAJOBS to create your resume.
Are you applying for a promotion? For GS positions, to be considered for promotion, you must provide SF-50(s) that shows you held the next lower GS grade for at least one year. SF-50s that have an effective date within the past year (e.g., General Adjustment SF-50 from this year or Within Rate/Grade Increases (WRI/WGI) SF-50 within a year) do not clearly show that you meet the one-year time-in-grade requirement. That means if you submit an SF-50 dated within the last year, you must submit another SF-50 that is dated more than one year ago to clearly demonstrate you meet the time-in-grade requirements. If you are a DoD employee, you can obtain a copy of your SF- 50(s) from MyBiz .
Are you claiming membership in any professional organizations, or possession of a license, certificate or credentials? Check the Conditions of Employment section above to see if any are required. If you claim membership, license, certification, or credentials, you must submit a copy of said document in your application package.
Are you using education as a substitute for some or all of the experience requirement? Is there a basic education requirement for this position? Check the Education section above to see what is allowed and what is required. Any claims you make in your resume or assessment questionnaire regarding education or degrees MUST be supported by submitting with your application official or unofficial transcripts or a list of courses, grades earned, completion dates, and quarter and semester hours earned issued from your school. While unofficial transcripts are acceptable for initial application, an official transcript will ultimately be required if you are selected for the position. You may submit a copy your degree(s) if specific coursework does not have to be verified.
Are you a veteran claiming 5-point veterans' preference or claiming sole survivorship preference? You must submit a copy of your latest DD-214 Certificate of Release or Discharge from Active Duty (any copy that shows all dates of service, as well as character of service [Honorable, General, etc.] is acceptable) OR a VA letter that shows dates of service or service connected disability AND character of service. If you have more than one DD-214 for multiple periods of active duty service, submit a copy for each period of service. If you were issued a DD-215 to amend aforementioned information on the DD-214 you must submit that too. If you are not sure of your preference eligibility, visit the Department of Labor's website: Veterans' Preference Advisor
Are you a disabled veteran or claiming 10-point veterans' preference?
If you are eligible to claim 10 point veterans preference you must submit a DD-214 Certificate of Release or Discharge from Active Duty as described above for 5-point preference.
You must also provide the applicable supporting documentation of your disability (e.g. disability letter from the VA) as described on Standard Form-15 (SF-15). http://www.opm.gov/forms/pdf_fill/SF15.pdf .
Are you an active duty service member? Active Duty Service Members are required to submit a statement of service printed on command letterhead and signed by the command. The statement of service must provide the branch of service, rate/rank, all dates of service, the expected date of discharge and anticipated character of service (Honorable, General, etc.).
Documents submitted as part of the application package, to include supplemental documents, may be shared beyond the Human Resources Office. Some supplemental documents contain personal information such as SSN and DOB and some documents such as military orders and marriage certificates may contain personal information for someone other than you. You may sanitize these documents to remove said personal information before you submit your application. You must provide an un-sanitized version of the documents if you are selected.
How to Apply
Click the Apply Online button to create an account or log in to your existing USAJOBS account.
To apply for this position, you must provide a complete Application Package which includes:
1. Complete resume with relevant experience, job title, duties and accomplishments. Your resume must show complete information for each job entry to support minimum qualifications. The following information should be provided in your resume, but it is acceptable to provide elsewhere in your application package: employer's name, starting and end dates (Mo/Yr), hours per week, and pay plan, series and grade level (e.g. GS-0201-09) for relevant federal experience. TIP: A good way to ensure you include all essential information is to use the Resume Builder in USAJOBS to create your resume.
2. Complete assessment questionnaire. For a quick preview of the assessment questionnaire click here: https://apply.usastaffing.gov/ViewQuestionnaire/12703403
3. Supporting documentation
Failure to submit a complete application package will result in an ineligible rating and loss of consideration.
Your complete application (resume, assessment questionnaire, and all supporting documents) must be received by 11:59 pm Eastern Standard Time (EST) on 03/05/2025. Applications received after 03/05/2025 will generally result in an ineligible rating and loss of consideration. If more than one resume is received, only the last resume received and processed will be reviewed.
Note: To check the status of your application or return to a previous or incomplete application, log into your USAJOBS account: https://mydon.usajobs.gov/Account/Login select Application Status, and click on the more information link under the application status for this position. Your uploaded documents may take several hours to clear the virus scan process so please plan appropriately.
You are encouraged to apply online. Applying online will allow you to review and track the status of your application.
Do not email or send hard copy resumes/applications to the Contact Information or Agency Information listed in this vacancy announcement. All resumes/applications received at the addresses listed in the Contact Information or Agency Information will be destroyed and will not be considered for this vacancy announcement.
It is the applicant's responsibility to verify that all information in their resume and documents are legible and accurate. HR will not modify answers/documents submitted by an applicant.
Agency contact information
Department of Navy EIC
Email doneic@us.navy.mil
Address NAVAL FAC ENGINEERING CMD WASH
1001 North St SE 208
Washington, DC 20020
US
Next steps
When the application process is complete, your complete application (resume, assessment questionnaire, and all supporting documents) will be reviewed to determine if you meet the hiring eligibility and qualification requirements for which you requested consideration. You will be rated based on the information provided in your resume and responses to the questionnaire, along with your supporting documentation to determine your level of knowledge, skill, and ability related to the job requirements.
Generally, only best qualified candidates will be referred to the hiring manager. Sometimes well qualified andminimally qualified candidates are referred. Occasionally, candidates eligible for priority consideration are referred, and no other candidates are referred.
The hiring manager may choose to conduct interviews.
You will be notified of our rating and referral decision. If you are referred, you will be notified when a hiring decision is made.
NOTE: If you have any questions or need assistance, please email the DON Employment Information Center at DONEIC@us.navy.mil
Fair & Transparent
The Federal hiring process is set up to be fair and transparent. Please read the following guidance.
- You will review contract plans, specifications, and scope to develop recommended construction duration to include in Requests for Proposals or contract solicitations.
- You will effectively communicate (both orally and in writing) with customers (including senior civilian and military staff, SES and Flag level) to ensure clarity of time impacts and aid in successful completion of a construction project.
- You will review and interpret construction contract drawing and specification requirements.
- You will review contractor's time impact analysis proposals to validate impacts to the approved construction schedule.
- You will utilize advanced and comprehensive knowledge of network analysis schedules and critical path method.
- You will review contractors' progress construction schedules to recommend approval or rejection, or to raise awareness to potential delays in order to mitigate and minimize time extensions.
- You will communicate NAVFAC requirements and positions during negotiations and recommend decisive actions to field office leadership as the basis for final action.
- You will develop, maintain, and provide scheduling training to each construction field office and respective personnel to bolster competencies.
- You will determine impacts to the contractor's approved construction schedule on critical, high-visibility projects, government's position on excusable delays, and executed pending modifications.
Requirements
Conditions of Employment
- Must be a US Citizen.
- Must be determined suitable for federal employment.
- Must participate in the direct deposit pay program.
- New employees to the Department of the Navy will be required to successfully pass the E-Verify employment verification check. To learn more about E-Verify, including your rights and responsibilities, visit www.dhs.gov/E-Verify/.
- Generally, current federal employees applying for GS jobs must serve at least one year at the next lower grade level. This requirement is called time-in-grade. Time-in-grade requirements must be met by the closing date of this announcement.
- Within the Department of Defense (DoD), the appointment of retired military members within 180 days immediately following retirement date to a civilian position is subject to the provisions of 5 United States Code 3326.
- You will be required to obtain and maintain a current valid United States driver's license.
- You will be required to obtain and maintain an interim and/or final security clearance prior to entrance on duty. Failure to obtain and maintain the required level of clearance may result in the withdrawal of a job offer or removal.
- This position is covered under the Defense Acquisition Workforce Improvement Act (DAWIA). You must be certified as a Career Field Engineering and Technical Management Level I. Certification is required within 24 months of appointment.
- You will be required to obtain and maintain a U.S. Passport.
- You will be required to complete ethics orientation within three months of appointment and submit a Confidential Financial Disclosure Report, OGE-450, within 30 days of appointment.
- This position may require travel from normal duty station to CONUS and OCONUS and may include remote or isolated sites. You must be able to travel on military and commercial aircraft for extended periods of time.
- You will be required to complete training, obtain, and maintain a government credit card for travel and travel-related purchases.
GS-13
Your resume must demonstrate at least one year of specialized experience at or equivalent to the GS-12 grade level or pay band in the Federal service or equivalent experience in the private or public sector: 1) Providing scheduling training to field offices and respective personnel covering basic understanding of network analysis schedules, critical path method, time impact analysis, baseline and progress schedule reviews; 2) Providing assistance in validating impacts to the approved construction schedule and reviewing time impact analysis proposal regarding affected activities on the critical path and assisting in developing the Government's position regarding delays and/or liability; 3) Utilizing scheduling programs (P6, MS Project), forecasting, techniques, and critical path methodology to gather and evaluate contractor schedule and technical performance; and 4) Analyzing and mitigating techniques for schedule variance, schedule adherence, system engineering, integrated logistics, quality assurance, production and contractual management of construction projects. NOTE: This information must be supported in your resume.
GS-12
Your resume must demonstrate at least one year of specialized experience at or equivalent to the GS-12 grade level or pay band in the Federal service or equivalent experience in the private or public sector: 1) Providing assistance and technical guidance to engineers/architects during the design phase of construction projects to ensure an appropriate construction duration is established for all construction projects; 2) Developing technical recommendations/solutions regarding construction scheduling issues and time impacts/complex problems during the administration and construction contracts; 3) Participating extensively in the pre-construction and post-construction award support aspects of scheduling requirements and performing Time Impact Analysis (TIA) on projects to ensure programs stay on track; and 4) Maintaining historical and current metrics on schedule growth differentiating types of delays impacting project progress (i.e. slow progress, rework, late procurement, internal delays). NOTE: Incumbent performs all or essentially all duties of the target position under general supervision and this information must be supported in your resume.
Additional qualification information can be found from the following Office of Personnel Management web site: http://www.opm.gov/qualifications/Standards/group-stds/gs-admin.asp .
Experience refers to paid and unpaid experience, including volunteer work done through National Service programs (e.g., professional, philanthropic, religious, spiritual, community, student, social). Volunteer work helps build critical competencies, knowledge, and skills and can provide valuable training and experience that translates directly to paid employment.
Education
This job does not have an education qualification requirement.
Additional information
This position is covered by the Department of Defense Priority Placement Program.
Additional vacancies may be filled by this announcement.
Recruitment incentives may be authorized to eligible new hires.
A relocation incentive is generally a single payment intended to offset some of the relocation costs experienced by the selectee. A relocation incentive may be authorized.
PCS is not authorized.
This position is eligible for part time, full time or ad-hoc telework at the discretion of management.
A tentative offer of employment will be rescinded if the selectee fails to meet the pre-employment requirements, including failure to report to any of the scheduled appointments.
If you are unable to apply online and request information about the Alternate Application process, please contact the Department of Navy's Employment Information Center.
Federal annuitant information: The selection of an annuitant is subject to the Department of Defense and Department of the Navy policy on the employment of annuitants. Policy information may be found at: http://www.secnav.navy.mil/donhr/Documents/CivilianJobs/FedCivAnnuitants.pdf
ICTAP Applicants: To be considered well-qualified and exercise selection priority as an ICTAP candidate, displaced Federal employees must satisfy all qualification requirements for the position and receive a rating in the highly qualified category (score 85) or higher. ICTAP candidates must provide copies of all of the following documentation at the time of application: 1) agency notice; 2) most recent performance appraisal; and 3) most recent SF-50 or notification of personnel action that includes position, grade level, and duty location. Applicants who do not provide this documentation will not receive consideration as an ICTAP candidate. For more information about ICTAP eligibility please review the following link: https://www.usajobs.gov/Help/working-in-government/unique-hiring-paths/federal-employees/career-transition/
Military Spouse Preference applicants will be placed at the highest grade for which they have applied and are determined Best Qualified (BQ). A BQ military spouse possesses knowledge, skills, abilities, and competencies comparable to others who meet the competitive referral criteria for the specific position.
PPP applicants will be placed at the FPL, if determined Well Qualified (WQ). To receive priority consideration, the FPL must be the same grade level or equivalent of the retained grade or the grade held immediately prior to separation.
How You Will Be Evaluated
You will be evaluated for this job based on how well you meet the qualifications above.
In order to qualify for this position, your resume must provide sufficient experience and/or education, knowledge, skills, and abilities to perform the duties of the specific position for which you are being considered. Your resume is the key means we have for evaluating your skills, knowledge, and abilities as they relate to this position. Therefore, we encourage you to be clear and specific when describing your experience.
When the application process is complete, we will review your resume to ensure you meet the hiring eligibility and qualification requirements listed in this announcement. You will be rated based on the information provided in your resume and responses to the Occupational Questionnaire, along with your supporting documentation to determine your ability to demonstrate the following competencies:
- COMPUTER LITERACY
- PROBLEM SOLVING
- PROJECT MANAGEMENT
- TRAINING PROGRAM ADMINISTRATION
- WRITTEN COMMUNICATION
If after reviewing your resume and supporting documentation, a determination is made that you inflated your qualifications and/or experience, your score may be adjusted to more accurately reflect your abilities or you may be found ineligible/not qualified.
Please follow all instructions carefully. Errors or omissions may affect your rating or consideration for employment.
All eligibility, qualifications, and time-in-grade requirements must be met by the closing date of this announcement.
Required Documents
You are required to provide documentation that supports the eligibility and qualification claims made in your resume and assessment questionnaire. You must submit the applicable documents listed here and those listed with the eligibilities you select in the announcement questionnaire with your application package. Applicants who do not provide supporting documentation that fully support their claims will not be referred to the hiring manager. Cover letter is optional.
A complete resume is required. Your resume must show relevant experience, job title, duties and accomplishments. Your resume must show complete information for each job entry to support minimum qualifications. The following information should be provided in your resume, but it is acceptable to provide elsewhere in your application package: employer's name, starting and end dates (Mo/Yr), hours per week, and pay plan, series and grade level (e.g. GS-0201-09) for relevant federal experience. TIP: A good way to ensure you include all essential information is to use the Resume Builder in USAJOBS to create your resume.
Are you applying for a promotion? For GS positions, to be considered for promotion, you must provide SF-50(s) that shows you held the next lower GS grade for at least one year. SF-50s that have an effective date within the past year (e.g., General Adjustment SF-50 from this year or Within Rate/Grade Increases (WRI/WGI) SF-50 within a year) do not clearly show that you meet the one-year time-in-grade requirement. That means if you submit an SF-50 dated within the last year, you must submit another SF-50 that is dated more than one year ago to clearly demonstrate you meet the time-in-grade requirements. If you are a DoD employee, you can obtain a copy of your SF- 50(s) from MyBiz .
Are you claiming membership in any professional organizations, or possession of a license, certificate or credentials? Check the Conditions of Employment section above to see if any are required. If you claim membership, license, certification, or credentials, you must submit a copy of said document in your application package.
Are you using education as a substitute for some or all of the experience requirement? Is there a basic education requirement for this position? Check the Education section above to see what is allowed and what is required. Any claims you make in your resume or assessment questionnaire regarding education or degrees MUST be supported by submitting with your application official or unofficial transcripts or a list of courses, grades earned, completion dates, and quarter and semester hours earned issued from your school. While unofficial transcripts are acceptable for initial application, an official transcript will ultimately be required if you are selected for the position. You may submit a copy your degree(s) if specific coursework does not have to be verified.
Are you a veteran claiming 5-point veterans' preference or claiming sole survivorship preference? You must submit a copy of your latest DD-214 Certificate of Release or Discharge from Active Duty (any copy that shows all dates of service, as well as character of service [Honorable, General, etc.] is acceptable) OR a VA letter that shows dates of service or service connected disability AND character of service. If you have more than one DD-214 for multiple periods of active duty service, submit a copy for each period of service. If you were issued a DD-215 to amend aforementioned information on the DD-214 you must submit that too. If you are not sure of your preference eligibility, visit the Department of Labor's website: Veterans' Preference Advisor
Are you a disabled veteran or claiming 10-point veterans' preference?
If you are eligible to claim 10 point veterans preference you must submit a DD-214 Certificate of Release or Discharge from Active Duty as described above for 5-point preference.
You must also provide the applicable supporting documentation of your disability (e.g. disability letter from the VA) as described on Standard Form-15 (SF-15). http://www.opm.gov/forms/pdf_fill/SF15.pdf .
Are you an active duty service member? Active Duty Service Members are required to submit a statement of service printed on command letterhead and signed by the command. The statement of service must provide the branch of service, rate/rank, all dates of service, the expected date of discharge and anticipated character of service (Honorable, General, etc.).
Documents submitted as part of the application package, to include supplemental documents, may be shared beyond the Human Resources Office. Some supplemental documents contain personal information such as SSN and DOB and some documents such as military orders and marriage certificates may contain personal information for someone other than you. You may sanitize these documents to remove said personal information before you submit your application. You must provide an un-sanitized version of the documents if you are selected.
How to Apply
Click the Apply Online button to create an account or log in to your existing USAJOBS account.
To apply for this position, you must provide a complete Application Package which includes:
1. Complete resume with relevant experience, job title, duties and accomplishments. Your resume must show complete information for each job entry to support minimum qualifications. The following information should be provided in your resume, but it is acceptable to provide elsewhere in your application package: employer's name, starting and end dates (Mo/Yr), hours per week, and pay plan, series and grade level (e.g. GS-0201-09) for relevant federal experience. TIP: A good way to ensure you include all essential information is to use the Resume Builder in USAJOBS to create your resume.
2. Complete assessment questionnaire. For a quick preview of the assessment questionnaire click here: https://apply.usastaffing.gov/ViewQuestionnaire/12703403
3. Supporting documentation
Failure to submit a complete application package will result in an ineligible rating and loss of consideration.
Your complete application (resume, assessment questionnaire, and all supporting documents) must be received by 11:59 pm Eastern Standard Time (EST) on 03/05/2025. Applications received after 03/05/2025 will generally result in an ineligible rating and loss of consideration. If more than one resume is received, only the last resume received and processed will be reviewed.
Note: To check the status of your application or return to a previous or incomplete application, log into your USAJOBS account: https://mydon.usajobs.gov/Account/Login select Application Status, and click on the more information link under the application status for this position. Your uploaded documents may take several hours to clear the virus scan process so please plan appropriately.
You are encouraged to apply online. Applying online will allow you to review and track the status of your application.
Do not email or send hard copy resumes/applications to the Contact Information or Agency Information listed in this vacancy announcement. All resumes/applications received at the addresses listed in the Contact Information or Agency Information will be destroyed and will not be considered for this vacancy announcement.
It is the applicant's responsibility to verify that all information in their resume and documents are legible and accurate. HR will not modify answers/documents submitted by an applicant.
Agency contact information
Department of Navy EIC
Email doneic@us.navy.mil
Address NAVAL FAC ENGINEERING CMD WASH
1001 North St SE 208
Washington, DC 20020
US
Next steps
When the application process is complete, your complete application (resume, assessment questionnaire, and all supporting documents) will be reviewed to determine if you meet the hiring eligibility and qualification requirements for which you requested consideration. You will be rated based on the information provided in your resume and responses to the questionnaire, along with your supporting documentation to determine your level of knowledge, skill, and ability related to the job requirements.
Generally, only best qualified candidates will be referred to the hiring manager. Sometimes well qualified andminimally qualified candidates are referred. Occasionally, candidates eligible for priority consideration are referred, and no other candidates are referred.
The hiring manager may choose to conduct interviews.
You will be notified of our rating and referral decision. If you are referred, you will be notified when a hiring decision is made.
NOTE: If you have any questions or need assistance, please email the DON Employment Information Center at DONEIC@us.navy.mil
Fair & Transparent
The Federal hiring process is set up to be fair and transparent. Please read the following guidance.
- Criminal history inquiries
- Equal Employment Opportunity (EEO) Policy
- Financial suitability
- New employee probationary period
- Privacy Act
- Reasonable accommodation policy
- Selective Service
- Signature and false statements
- Social security number request
group id: DOTN